Rise Over Run
Slope = rise/run = (yโโyโ)/(xโโxโ). Rise is vertical change; run is horizontal. Percentage grade = slope ร 100%. Used for road grades, roof pitch (e.g. 4:12), wheelchair ramps (max 1:12), and stairs.
Why This Mathematical Concept Matters
Why: Rise over run is the foundation of slope. Road grades (6% = 6 ft per 100 ft), roof pitch (4:12), ADA ramps (1:12 max), and ski slopes all use this measure.
How: Rise = yโ โ yโ, Run = xโ โ xโ. Slope m = rise/run. Angle ฮธ = arctan(m). Percentage grade = m ร 100. Vertical line: run=0, slope undefined.
- โ6% road grade = 6 ft rise per 100 ft run.
- โ4:12 roof pitch = 4" rise per 12" run.
- โADA ramp max 1:12 (8.33% grade).
Sample Examples โ Click to Load & Calculate
Enter Two Points
Point 1
Point 2
โ ๏ธFor educational and informational purposes only. Verify with a qualified professional.
๐งฎ Fascinating Math Facts
Slope = rise/run = ฮy/ฮx.
โ Coordinate Geometry
Grade = slope ร 100%.
โ Application
Key Takeaways
- โข Rise = (vertical change)
- โข Run = (horizontal change)
- โข Slope = rise/run =
- โข Angle = (with x-axis)
- โข Percentage grade = slope ร 100% (e.g. road grades, roof pitch)
Did You Know?
A 6% grade means the road rises 6 feet for every 100 feet horizontally. Steep roads can be 10โ15%.
Roof pitch is often given as rise:run (e.g. 4:12 means 4" rise per 12" run).
ADA recommends max 1:12 slope (8.33%). A 1" rise requires 12" of run.
Green runs ~15โ25%, blue ~25โ40%, black 40%+. Vertical drop / horizontal distance.
Typical step: 7" rise, 11" run. Rule of thumb: 2รrise + run โ 25 inches.
Positive slope: line rises left to right. Negative: line falls. Zero: horizontal.
Understanding Rise Over Run
Given two points and :
The slope m is the rate of change of y with respect to x. Percentage grade = m ร 100.
Expert Tips
Order Doesn't Matter
Swapping Pโ and Pโ negates both rise and run, so the slope stays the same.
Vertical Line
When run=0 (same x-coordinate), slope is undefined. The line is vertical.
Horizontal Line
When rise=0 (same y-coordinate), slope is 0. The line is horizontal.
Grade Interpretation
10% grade = 10 units up per 100 units forward. Common for steep driveways.
Frequently Asked Questions
What is rise over run?
Rise is the vertical change (ฮy); run is the horizontal change (ฮx). Slope = rise/run.
What is percentage grade?
Grade = slope ร 100%. A 5% grade means 5 units up per 100 units forward.
When is slope undefined?
When the two points have the same x-coordinate (run=0). The line is vertical.
What is a 1:12 slope?
Rise 1, run 12. Slope = 1/12 โ 0.083. Common for wheelchair ramps.
How do I read roof pitch 4:12?
4 inches of rise for every 12 inches of run. Slope = 4/12 = 1/3.
What does negative slope mean?
The line falls from left to right. Rise is negative (y decreases as x increases).
How is this used in construction?
Road grades, roof pitch, ramp design, drainage slope, and stair design.
How to Use This Calculator
- Enter the coordinates of two points, or click a sample example.
- Click Calculate to get rise, run, slope, angle, and percentage grade.
- Review the visualization showing rise and run.
- Check the step-by-step solution and copy results if needed.
Disclaimer: This calculator is for educational use. For construction, verify with local codes (e.g. ADA ramp requirements).